
Assessment
Level 2 NVQ Diploma In Insulation And Building Treatments (Construction)
Description
This qualification aims to grant delegates the ability to prove their competence in one or more of the following areas: Wood Preserving And Damp-Proofing, Wall Tie Replacement, Cavity Wall Insulation, Solid Floor Insulation, Under Floor Insulation, and Cold Roof Insulation.
Progression Opportunities
Successful delegates gain the opportunity to progress in a wide range of building maintenance and treatment and insulation roles.
Location
On-site
Entry Requirements
To undertake any NVQ, delegates will need to have prior knowledge of the chosen qualification you are looking to achieve. To achieve the qualification delegates will be assessed against a set of criteria in the work environment.
Delegates must:
- Have experience in their chosen area of skill.
- Have basic level of literacy.
- Be in some form of employment or have access to an observable working situation.
- Basic IT skills may be required but is not essential.
Who Should Attend?
This qualification is ideal for those who work with different types of insulation and building treatments and want to demonstrate their competence.
Course Duration
Course duration varies depending on pathway undertaken.
Method of Assessment
On-site Assessment
Certification
Level 2 NVQ Diploma In Insulation And Building Treatments (Construction)
Available Pathways
Delegates can choose from the following pathways:
- Wood Preserving and Damp-Proofing
- Wall Tie Replacement
- Cavity Wall Insulation
- Solid Floor Insulation
- Under Floor Insulation
- Cold Roof Insulation
Pathway 1 – Level 2 NVQ in Wood Preserving and Damp-Proofing
- Preparing structures for treatment in the workplace
- Applying preservation treatment in the workplace
- Reinstating the structure after building treatments in the workplace
- Conforming to general health, safety and welfare in the workplace
- Conforming to productive working practices in the workplace
- Moving, handling and storing resources in the workplace
- Insulation and building treatments building construction, defects and interfaces
Pathway 2 – Level 2 NVQ in Wall Tie Replacement
- Preparing structures for treatment in the workplace
- Reinstating the structure after building treatments in the workplace
- Installing wall ties in existing structures in the workplace
- Conforming to general health, safety and welfare in the workplace
- Conforming to productive working practices in the workplace
- Moving, handling and storing resources in the workplace
Pathway 3 – Level 2 NVQ in Cavity Wall Insulation
- Installing cavity wall insulation in the workplace
- Conforming to general health, safety and welfare in the workplace
- Conforming to productive working practices in the workplace
- Moving, handling and storing resources in the workplace
- Insulation and building treatments building construction, defects and interfaces
Pathway 4 – Level 2 NVQ in Solid Floor Insulation
- Conforming to general health, safety and welfare in the workplace
- Conforming to productive working practices in the workplace
- Moving, handling and storing resources in the workplace
- Installing insulation to solid floors in the workplace
- Insulation and building treatments building construction, defects and interfaces
Pathway 5 – Level 2 NVQ in Under Floor Insulation
- Conforming to general health, safety and welfare in the workplace
- Conforming to productive working practices in the workplace
- Moving, handling and storing resources in the workplace
- Insulation and building treatments building construction, defects and interfaces
- Installing insulation to suspended floors in the workplace (optional)
- Spraying insulation to suspended floors in the workplace (optional)
Pathway 6 – Level 2 NVQ in Cold Roof Insulation
- Installing insulation to cold roofs in the workplace
- Conforming to general health, safety and welfare in the workplace
- Conforming to productive working practices in the workplace
- Moving, handling and storing resources in the workplace
- Insulation and building treatments building construction, defects and interfaces
Additional Optional Units for All Pathways
- Erecting and dismantling access/working platforms in the workplace (optional)
- Develop customer relationships (optional)